Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 1,169,000 x
C175 V-Belt MBI 
Checkout 2
Rp 89,099 x
MILLING N50 BK SK 
V belt LB 64 Combine Harvester
Rp 439,500 x
AG8A LB 64 VB MBI AW 70/82 
Tempat produk
Rp 767,585 x
VBELT - AG 8A LC 96 MBI 
Checkout 3
Rp 70,840 x
RECMF8440 V-Belt MBI 
Checkout 4
Rp 22,800 x
A38 V-Belt MBI 
Cover 1 Fuel Tank, Comp RD 140 DI-2T
Rp 70,000 x
Cover 1 Fuel Tank, Comp RD 85 DI - 1 T 
Checkout 5
Rp 62,790 x
RECMF8390 V-Belt MBI 
Checkout 6
Rp 34,800 x
A58 V-Belt MBI 
Tempat produk
Rp 100,000 x
Shaft Idle Gear RD 105-110 DI-2 
Checkout 7
Rp 23,591,700 x
Mesin Diesel Kubota AC 60-D1-Q 
Checkout 8
Rp 58,800 x
A98 V-Belt MBI 
Checkout 9
Rp 62,000 x
Bolt DC 35 
Checkout 10
Rp 95,400 x
B106 V-Belt MBI 
Checkout 11
Rp 59,570 x
RECMF8370 V-Belt MBI 
Tempat produk
Rp 575,960 x
V BELT AG-X LC 56 DC 35 
Tempat produk
Rp 28,000 x
Key, Flywheel RD 75-85 / 105-115 DI - 1/2 
V belt Maxi Combine Harvester
Rp 1,133,859 x
V Belt Maxxi NDR 85 9-J5-1605 | 5R-3V630 
V belt LB 68 Combine Harvester
Rp 429,300 x
AG8A LB 68 VB MBI 
Checkout 12
Rp 57,000 x
A95 V-Belt MBI 

Subtotal

Rp 28,918,003

Pengirman

Total

Rp 28,918,003

Pembayaran

  • Transfer Bank Rekening Niagakita