Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
V BELT - AG 8A LC 63
Rp 150 x
V BELT - AG 8A LC 63 
Checkout 1
Rp 227,500 x
SEAL OLI D1105 
Checkout 2
Rp 2,196,090 x
Conveyor 1 st AW70V/AW82 
Checkout 3
Rp 64,400 x
RECMF8400 V-Belt MBI 
Tempat produk
Rp 8,000 x
Decomp, Lever Handle All Type 
V belt LB 87 Combine Harvester
Rp 440,000 x
AG6A LB 67 DC 35 MBI 
cylinder head assy rd 75
Rp 525,000 x
CYLINDER HEAD ASSY RD 75-85 DI-1/2 
Tempat produk
Rp 606,045 x
VBELT - AG 8A LB 104 MBI 
Piston RD 95
Rp 250,000 x
Piston RD 85 DI -1/2 
Checkout 4
Rp 19,500 x
PULLY TENSION ONLY TL800/G900B 
Checkout 5
Rp 150,300 x
B167 V-Belt MBI 
Checkout 6
Rp 875,000 x
Bearing Main - 2 RD 160 
Tempat produk
Rp 15,000 x
Clamp Pipe Muffler KND/RD 75-85 DI/RD 160 
Checkout 7
Rp 73,800 x
B82 V-Belt MBI 
Checkout 8
Rp 59,570 x
RECMF8370 V-Belt MBI 

Subtotal

Rp 5,510,355

Pengirman

Total

Rp 5,510,355

Pembayaran

  • Transfer Bank Rekening Niagakita