Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 22,800 x
A38 V-Belt MBI 
Checkout 2
Rp 9,700 x
NOK Oil Seal TC 30 - 46 - 8 
Checkout 3
Rp 875,000 x
Bearing Main - 2 RD 160 
V belt LB 64 Combine Harvester
Rp 879,000 x
AG8A LB 64 VB MBI AW 70/82 
Checkout 4
Rp 328,704 x
AG-X LB 49 V-Belt MBI 
Checkout 5
Rp 837,375 x
Frame C Tension RH DC35 
V BELT - AG 8A LC 109
Rp 871,529 x
V BELT - AG 8A LC 109 
Checkout 6
Rp 717,782 x
AG-X LB-107 V-Belt MBI 
Checkout 7
Rp 27,375 x
REMF1375 V-Belt MBI 
Checkout 8
Rp 57,760 x
RECMF8380 V-Belt MBI 
Checkout 9
Rp 74,596 x
RECMF6680 V-Belt MBI 
Checkout 10
Rp 85,500 x
B95 V-Belt MBI 
Bonnet
Rp 130,000 x
BONNET RD 85 DI -2 
Cover 2 Fuel Tank, Comp RD 85 DI -2 T
Rp 116,000 x
Cover 2 Fuel Tank, Comp RD 140 DI-2T 
Checkout 11
Rp 435,000 x
CONNECTING ROD, ASSY RD 45-55-65 

Subtotal

Rp 5,468,121

Pengirman

Total

Rp 5,468,121

Pembayaran

  • Transfer Bank Rekening Niagakita