Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 500,000 x
Piston Kit RD 65 
Checkout 2
Rp 174,600 x
B194 V-Belt MBI 
Checkout 3
Rp 49,800 x
A83 V-Belt MBI 
Checkout 4
Rp 141,680 x
RECMF8440 V-Belt MBI 
Guide Crawler R
Rp 489,375 x
GUIDE CRAWLER R DC 35 
Checkout 5
Rp 150,300 x
B167 V-Belt MBI 
Checkout 6
Rp 18,980 x
REMF1260 V-Belt MBI 
Checkout 7
Rp 279,125 x
ARM TENSION 120 AW70/AW82 
Checkout 8
Rp 4,334,000 x
KUBOTA GASOLINE ENGINE KG65 
Checkout 9
Rp 114,000 x
A190 V-Belt MBI 
Checkout 10
Rp 2,100,000 x
CAM SHAFT RD 160 / KND 180-190-220-250 
Checkout 11
Rp 82,800 x
B92 V-Belt MBI 

Subtotal

Rp 8,434,660

Pengirman

Total

Rp 8,434,660

Pembayaran

  • Transfer Bank Rekening Niagakita