Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 1,027,000 x
ASSY RING PISTON JPN TIPIS V2403-6 
Checkout 2
Rp 57,760 x
RECMF8380 V-Belt MBI 
Checkout 3
Rp 3,681,000 x
Bearing Main - 2 KND/ ER - 220 - 250 - DI 
Tempat produk
Rp 460,000 x
V BELT - AG 6A LB 87 
Checkout 4
Rp 292,250 x
C175 V-Belt MBI 
Checkout 5
Rp 1,692,282 x
ROLLER ASSY TRACK B AW70V/AW82 
Checkout 6
Rp 274,000 x
Packing Mission Case aw70 - aw82 
crawler kubota dc 70
Rp 12,500,000 x
Crawler Kubota DC 70 (500 X 53 X 90) 
Reflector, Comp RD 50-55-65
Rp 90,000 x
Reflector, Comp RD 50-55-65 
V BELT - AG 8A LC 109
Rp 871,529 x
V BELT - AG 8A LC 109 
Tempat produk
Rp 160,000 x
Pulley Tension, Assy RD 75-85 DI -1/2 
Checkout 7
Rp 64,400 x
RECMF8400 V-Belt MBI 
Checkout 3
Rp 825,000 x
Bearing Main - 2 KND/ ER 180-190 
Checkout 9
Rp 32,550 x
B20 V-Belt MBI 
Checkout 10
Rp 85,500 x
B95 V-Belt MBI 
Checkout 11
Rp 81,900 x
B91 V-Belt MBI 
Checkout 12
Rp 296,000 x
APPARATUS FUEL LIMITER RD 45-55-65 
Checkout 3
Rp 862,000 x
Bearing Main - 1 KND/ ER 180-190-220-250 
Vbelt Mitsuboshi 3V-900
Rp 75,000 x
V Belt 3V - 900 Mitsuboshi 
Checkout 1
Rp 90,200 x
FUEL FILTER V2403 
Checkout 15
Rp 57,600 x
A96 V-Belt MBI 
Tempat produk
Rp 170,000 x
Pin Piston RD 95-105-115 / ER 800-900 
Checkout 16
Rp 24,000 x
GASKET CRANK CASE COVER,NA RD 50-55-65 
Tempat produk
Rp 130,000 x
Gear Balancer 3 RD 65 DI 2 S 
Checkout 17
Rp 85,800 x
A143 V-Belt MBI 

Subtotal

Rp 23,985,771

Pengirman

Total

Rp 23,985,771

Pembayaran

  • Transfer Bank Rekening Niagakita