Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Cover 1 Fuel Tank, Comp RD 65 DI -1S
Rp 70,000 x
Cover 1 Fuel Tank, Comp RD 65 DI -1S 
V belt LB 68 Combine Harvester
Rp 858,600 x
AG8A LB 68 VB MBI 
Tempat produk
Rp 1,168,000 x
V BELT - AG 8A LC 111 
Checkout 1
Rp 37,800 x
A63 V-Belt MBI 
Checkout 2
Rp 73,800 x
A123 V-Belt MBI 
Checkout 3
Rp 11,275 x
Nut M14 AW70V / AW80 
Cover 1 Fuel Tank, Comp RD 140 DI-2T
Rp 70,000 x
Cover 1 Fuel Tank, Comp RD 85 DI - 1 T 
Checkout 4
Rp 142,200 x
B158 V-Belt MBI 
Checkout 5
Rp 1,367,088 x
SANWA YC-712-2 HP 0.33-3000 
Tempat produk
Rp 449,452 x
V BELT AG-X LB 67 DC 35 
Checkout 6
Rp 150,000 x
Bearing Shaft Start KND 180-190-220-250-315 
Checkout 7
Rp 62,790 x
RECMF8390 V-Belt MBI 
V belt Maxi Combine Harvester
Rp 1,133,859 x
V Belt Maxxi NDR 85 9-J5-1605 | 5R-3V630 
Checkout 8
Rp 16,750 x
M18 V-Belt MBI 
Tempat produk
Rp 35,000 x
Pipe Muffler KND/ RD 75-85 DI-1/2 / RD160 
Checkout 9
Rp 8,000 x
NUT,CAP APPARATUS FUEL LIMITER RD 75-85 / 105-115 DI -1/2 
V belt LC 56 Combine Harvester
Rp 472,300 x
AG8A LC 56 DC 35 MBI 

Subtotal

Rp 6,126,914

Pengirman

Total

Rp 6,126,914

Pembayaran

  • Transfer Bank Rekening Niagakita