Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 22,800 x
A38 V-Belt MBI 
Checkout 2
Rp 158,600 x
VALVE EXHAUST D1105 
Checkout 3
Rp 28,661,600 x
Mesin Diesel Kubota OC 95-E2-D1-Q 
Checkout 4
Rp 6,500 x
WASHER SPRING 14 AW70/AW82 
V BELT - AG 8A LC 109
Rp 871,529 x
V BELT - AG 8A LC 109 
Checkout 5
Rp 90,000 x
SUPPORT, FUEL TANK 2 RD 75-85 DI -1/2 
Tempat produk
Rp 575,960 x
V BELT AG-X LC 56 DC 35 
V belt Maxi Combine Harvester
Rp 1,133,859 x
V Belt Maxxi NDR 85 9-J5-1605 | 5R-3V630 
kip ring piston rd 85
Rp 75,000 x
KIP Ring Piston RD 85 DI,1/2 T 
Tempat produk
Rp 14,000 x
Key, Cam Shaft KND/ RD 85-115 DI 
Checkout 6
Rp 40,000 x
SARANGAN SEGI 4 BUMBUNGSUNGSANG 
Cover 1 Fuel Tank, Comp RD 140 DI-2T
Rp 125,000 x
Cover 1 Fuel Tank, Comp RD 110 DI-2T 
Tempat produk
Rp 460,000 x
V BELT - AG 6A LB 87 

Subtotal

Rp 32,234,848

Pengirman

Total

Rp 32,234,848

Pembayaran

  • Transfer Bank Rekening Niagakita