Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 25,200 x
M36 V-Belt MBI 
Checkout 2
Rp 59,000 x
STUD,HEAD KND/ RD/ER 75-85 
Tempat produk
Rp 193,000 x
Air Cleaner Assy RD 50 - 65 T / DI - S 
Checkout 3
Rp 13,956 x
NUT M10 
V belt LB 68 Combine Harvester
Rp 429,300 x
AG8A LB 68 VB MBI 
Checkout 4
Rp 62,790 x
RECMF8390 V-Belt MBI 
Checkout 5
Rp 90,000 x
Bulb Lamp Head RD 85 - 105 DI - 1 / 2 
V belt Maxi Combine Harvester
Rp 1,133,859 x
V Belt Maxxi NDR 85 9-J5-1605 | 5R-3V630 
V BELT - AG 8A LC 109
Rp 871,529 x
V BELT - AG 8A LC 109 
Tempat produk
Rp 575,960 x
V BELT AG-X LC 56 DC 35 
Tempat produk
Rp 449,452 x
V BELT AG-X LB 67 DC 35 
Checkout 6
Rp 15,228,000 x
RD 85 DIH-1S 8.5 RPM 2.200 
Checkout 7
Rp 59,570 x
RECMF8370 V-Belt MBI 
Ring Piston RD 85
Rp 680,000 x
Ring Piston KND/ER 180-190-1500 
Checkout 8
Rp 862,000 x
Bearing Main - 1 KND/ ER 180-190-220-250 

Subtotal

Rp 20,733,616

Pengirman

Total

Rp 20,733,616

Pembayaran

  • Transfer Bank Rekening Niagakita