Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 19,707,000 x
RD 110 DI-2T 11 RPM 2.400 
Tempat produk
Rp 460,000 x
V BELT - AG 6A LB 87 
Checkout 2
Rp 166,500 x
B185 V-Belt MBI 
V BELT - AG 8A LC 109
Rp 1,743,058 x
V BELT - AG 8A LC 109 
Checkout 3
Rp 825,000 x
Bearing Main - 2 KND/ ER 180-190 
Checkout 4
Rp 206,691 x
YOKE INNER AW70/AW82 
Checkout 5
Rp 30,411,000 x
RD 150 DI-NB 15 RPM 2.400 
V belt LB 64 Combine Harvester
Rp 879,000 x
AG8A LB 64 VB MBI AW 70/82 
Checkout 3
Rp 875,000 x
Bearing Main - 2 RD 160 
Checkout 7
Rp 85,500 x
B95 V-Belt MBI 
Checkout 8
Rp 27,010 x
RECMF1370 V-Belt MBI 
Vbelt Mitsuboshi 3V-900
Rp 75,000 x
V Belt 3V - 900 Mitsuboshi 
Checkout 9
Rp 27,600 x
A46 V-Belt MBI 
Checkout 10
Rp 62,790 x
RECMF8390 V-Belt MBI 
Checkout 11
Rp 1,690,000 x
PISTON D1105 
Checkout 12
Rp 51,600 x
A86 V-Belt MBI 
V belt LB 87 Combine Harvester
Rp 220,000 x
AG6A LB 67 DC 35 MBI 
Tempat produk
Rp 767,585 x
VBELT - AG 8A LC 96 MBI 
Checkout 13
Rp 57,760 x
RECMF8380 V-Belt MBI 
V BELT - AG 8A LC 55 MBI
Rp 879,525 x
V BELT - AG 8A LC 55 MBI 
V BELT - AG 8A LC 63
Rp 150 x
V BELT - AG 8A LC 63 

Subtotal

Rp 59,217,769

Pengirman

Total

Rp 59,217,769

Pembayaran

  • Transfer Bank Rekening Niagakita