Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 3,500,000 x
Bearing Main - 2 RD 160 
V belt LC 56 Combine Harvester
Rp 472,300 x
AG8A LC 56 DC 35 MBI 
Checkout 2
Rp 22,800 x
A38 V-Belt MBI 
V belt Maxi Combine Harvester
Rp 1,133,859 x
V Belt Maxxi NDR 85 9-J5-1605 | 5R-3V630 
Checkout 3
Rp 288,910 x
C173 V-Belt MBI 
Checkout 4
Rp 68,400 x
B76 V-Belt MBI KUNING 
Tempat produk
Rp 6,000 x
Key Shaft Balancer RD 85 - 105 - 115 DI - 2 
Checkout 5
Rp 38,710 x
REMF6395 V-Belt MBI 
V belt LB 64 Combine Harvester
Rp 439,500 x
AG8A LB 64 VB MBI AW 70/82 
Checkout 6
Rp 12,688 x
RING 52 DALAM AW70V/AW82 
Checkout 7
Rp 507,000 x
METAL, CRANKSHAFT D1105 
Tempat produk
Rp 50,000 x
Switch Lamp, Assy RD 85 DI - 1 / 2 T 
Checkout 8
Rp 41,800 x
RECMF6400 V-Belt MBI 

Subtotal

Rp 6,581,967

Pengirman

Total

Rp 6,581,967

Pembayaran

  • Transfer Bank Rekening Niagakita