Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 406,000 x
Roller Carrier 138 AW70V/WA82 
Checkout 2
Rp 837,375 x
FRAME C. TENSION LH DC 35 
Checkout 3
Rp 21,500 x
A26 V-Belt MBI 
Checkout 4
Rp 4,334,000 x
KUBOTA GASOLINE ENGINE KG65 
Checkout 5
Rp 1,728,000 x
GEAR FINAL 32 AW70/AW82 
Checkout 6
Rp 279,125 x
ARM TENSION 120 AW70/AW82 
Checkout 7
Rp 43,000 x
HOLDER CHAIN DC 35. DC60. DC70 
Checkout 8
Rp 96,000 x
A160 V-Belt MBI 
Checkout 9
Rp 975,000 x
Assy Chain Feeder DC 35 
Checkout 10
Rp 43,200 x
B48 V-Belt MBI KUNING 
Checkout 11
Rp 839,682 x
CASE BEVEL AW70/AW82 

Subtotal

Rp 9,602,882

Pengirman

Total

Rp 9,602,882

Pembayaran

  • Transfer Bank Rekening Niagakita