Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 598,125 x
Roller Track (165) DC35 
V belt RECMF
Rp 42,323 x
L1 RECMF 6405 VB MBI 
Checkout 2
Rp 10,834,000 x
COMP, CYLINDER HEAD D1105 
Checkout 3
Rp 90,200 x
FUEL FILTER V2403 
Checkout 4
Rp 16,750 x
M18 V-Belt MBI 
Checkout 3
Rp 11,310,000 x
ASSY STARTER V2403 - 6 
Checkout 6
Rp 16,247,000 x
RD 85 DI-2S 8.5 RPM 2.200 
Tempat produk
Rp 460,000 x
V BELT - AG 6A LB 87 
V BELT - AG 8A LC 55 MBI
Rp 439,762 x
V BELT - AG 8A LC 55 MBI 
V belt LC 56 Combine Harvester
Rp 472,300 x
AG8A LC 56 DC 35 MBI 
Checkout 3
Rp 237,094 x
METAL, SIDE V2403 - 6 
Checkout 8
Rp 1,227,000 x
Bearing Main - 2 KND/ ER - 220 - 250 - DI 

Subtotal

Rp 41,974,554

Pengirman

Total

Rp 41,974,554

Pembayaran

  • Transfer Bank Rekening Niagakita