Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 825,000 x
Bearing Main - 2 KND/ ER 180-190 
Cover 2 Fuel Tank, Comp RD 65 DI -1S
Rp 75,000 x
Cover 2 Fuel Tank, Comp RD 85 DI - 2 S 
Checkout 2
Rp 81,000 x
B90 V-Belt MBI 
Checkout 3
Rp 295,000 x
Lamp Head, Assy RD 85 DI 1/2 - T 
Checkout 4
Rp 66,600 x
B74 V-Belt MBI KUNING 
Checkout 5
Rp 128,400 x
A107 V-Belt MBI 
Tempat produk
Rp 37,000 x
Switch Lamp, Assy RD 85 DI - 1 / 2 T 
Checkout 6
Rp 958,000 x
Assy Gear DC 70 
Checkout 7
Rp 237,094 x
METAL, SIDE V2403 - 6 
Checkout 8
Rp 45,900 x
B51 V-Belt MBI KUNING 
Checkout 9
Rp 7,500 x
Cir - Clip Internal DC 35 (04611-00900) 
Checkout 10
Rp 90,000 x
A150 V-Belt MBI 
Checkout 11
Rp 32,550 x
B27 V-Belt MBI 
Checkout 12
Rp 59,400 x
A99 V-Belt MBI 
Checkout 13
Rp 21,700 x
K31 V-Belt MBI 
Checkout 14
Rp 24,750 x
CUTTING BLADE DC 35.DC 60.DC 70 
Checkout 15
Rp 46,800 x
A78 V-Belt MBI 
Checkout 16
Rp 162,000 x
B180 V-Belt MBI 

Subtotal

Rp 3,193,694

Pengirman

Total

Rp 3,193,694

Pembayaran

  • Transfer Bank Rekening Niagakita