Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 140,280 x
C84 V-Belt MBI 
Checkout 2
Rp 300,000 x
Muffler KND/ER 220-250 
Checkout 3
Rp 68,400 x
A114 V-Belt MBI 
Checkout 4
Rp 839,682 x
SHAFT,ECCENTRIC AW70V/AW82 
Checkout 5
Rp 38,063 x
NUT M24 
V BELT - AG 8A LC 55 MBI
Rp 439,762 x
V BELT - AG 8A LC 55 MBI 
Checkout 6
Rp 358,000 x
BEARING BALANCER-2 RD 105-110 DI-2 
Checkout 7
Rp 97,500 x
SHAFT TRACK ROLLER DC 35 
Checkout 8
Rp 960,196 x
AG COG20 RCLB-59 V-Belt MBI 
Checkout 9
Rp 350,000 x
Bearing Main - 2 RD 75 DI -2 
Checkout 10
Rp 38,392,000 x
RD 110 DI-N RPM 2.400 

Subtotal

Rp 41,983,883

Pengirman

Total

Rp 41,983,883

Pembayaran

  • Transfer Bank Rekening Niagakita