Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Tempat produk
Rp 767,585 x
VBELT - AG 8A LC 96 MBI 
Checkout 1
Rp 85,500 x
B95 V-Belt MBI 
Checkout 2
Rp 308,950 x
C185 V-Belt MBI 
Cover 1 Fuel Tank, Comp RD 140 DI-2T
Rp 116,000 x
Cover 1 Fuel Tank, Comp RD 140 DI-2T 
Checkout 3
Rp 428,750 x
BEVEL GEAR DC 35 
Tempat produk
Rp 575,960 x
V BELT AG-X LC 56 DC 35 
V belt LC 56 Combine Harvester
Rp 472,300 x
AG8A LC 56 DC 35 MBI 
Checkout 4
Rp 19,400 x
NOK Oil Seal TC 35 - 50 - 8 
Checkout 5
Rp 80,000 x
SARANGAN UTUH BAJA N70 SK 
Checkout 6
Rp 41,500 x
CAPIT SARANGAN N70 DRAT 
Vbelt Mitsuboshi 3V-900
Rp 75,000 x
V Belt 3V - 900 Mitsuboshi 
Checkout 7
Rp 317,300 x
C190 V-Belt MBI 
Checkout 8
Rp 288,910 x
C173 V-Belt MBI 
Tempat produk
Rp 449,452 x
V BELT AG-X LB 67 DC 35 
Checkout 4
Rp 12,700 x
NOK Oil Seal TC 45 - 65 - 10 

Subtotal

Rp 4,039,307

Pengirman

Total

Rp 4,039,307

Pembayaran

  • Transfer Bank Rekening Niagakita