Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 9,700 x
NOK Oil Seal TC 35 - 50 - 8 
Checkout 2
Rp 21,500 x
A23 V-Belt MBI 
Checkout 3
Rp 1,245,000 x
Roller Assy DC 70 
Checkout 4
Rp 48,600 x
A81 V-Belt MBI 
V belt Maxi Combine Harvester
Rp 1,133,859 x
V Belt Maxxi NDR 85 9-J5-1605 | 5R-3V630 
V belt LB 104 Combine Harvester
Rp 348,828 x
N2 LB104 DC 35 MBI CMB 
Checkout 5
Rp 68,000 x
SARANGAN N70 SK 
Checkout 6
Rp 153,000 x
B170 V-Belt MBI 
Checkout 1
Rp 7,200 x
NOK Oil Seal TC 20 - 30 - 70 
Checkout 8
Rp 85,500 x
B95 V-Belt MBI 
Tempat produk
Rp 1,813,238 x
SANWA YC-80B-4 HP 0.50 - 1500 
Checkout 9
Rp 963,000 x
Cylinder Liner KND 300-315 
Vbelt Mitsuboshi 3V-900
Rp 75,000 x
V Belt 3V - 900 Mitsuboshi 
Checkout 1
Rp 8,000 x
NOK Oil Seal TC 30 - 45 - 8 
Checkout 1
Rp 11,600 x
NOK Oil Seal TC 35 - 58 - 12 
Tempat produk
Rp 460,000 x
V BELT - AG 6A LB 87 
Checkout 12
Rp 2,350,000 x
INJECTION PUMP, ASSY RD 65 DI (T) 
V belt LB 64 Combine Harvester
Rp 439,500 x
AG8A LB 64 VB MBI AW 70/82 
Checkout 13
Rp 13,827,242 x
COMP, CRANKSHAFT V2403 - 7 

Subtotal

Rp 23,068,767

Pengirman

Total

Rp 23,068,767

Pembayaran

  • Transfer Bank Rekening Niagakita