Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 59,570 x
RECMF8370 V-Belt MBI 
Checkout 2
Rp 22,800 x
A38 V-Belt MBI 
Checkout 3
Rp 292,250 x
C175 V-Belt MBI 
Checkout 4
Rp 292,500 x
METAL, CRANKSHAFT D1105 
Tempat produk
Rp 25,000 x
Gasket Delivery Valve RD 75-85 / 105-115 DI -1/2 
Checkout 5
Rp 288,910 x
C173 V-Belt MBI 
Checkout 6
Rp 66,000 x
A110 V-Belt MBI 
Vbelt Mitsuboshi 3V-900
Rp 150,000 x
V Belt 3V - 900 Mitsuboshi 
V belt LC 56 Combine Harvester
Rp 472,300 x
AG8A LC 56 DC 35 MBI 
Checkout 7
Rp 440,000 x
Selang Sprayer 5 Ply 50 m 
Tempat produk
Rp 187,000 x
Sleeve Control RD 75-85 / 105-115 DI -1/2 
V belt LB 68 Combine Harvester
Rp 429,300 x
AG8A LB 68 VB MBI 

Subtotal

Rp 2,725,630

Pengirman

Total

Rp 2,725,630

Pembayaran

  • Transfer Bank Rekening Niagakita