Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 24,500 x
K35 V-Belt MBI 
V BELT - AG 8A LC 55 MBI
Rp 439,762 x
V BELT - AG 8A LC 55 MBI 
Checkout 2
Rp 677,532 x
AG-X LB 101 V-Belt MBI 
Checkout 3
Rp 67,800 x
A113 V-Belt MBI 
Checkout 4
Rp 75,600 x
A126 V-Belt MBI 
Tempat produk
Rp 70,000 x
Gasket Cylinder Head, NA RD 75-85 
Checkout 5
Rp 13,915 x
MF1230 V-Belt MBI 
Tempat produk
Rp 607,000 x
Plunger RD 45-55-65-70 
Checkout 6
Rp 6,275,000 x
GENSET VGG 8888 EU (6300-6800 WATT) 
Checkout 7
Rp 140,400 x
B156 V-Belt MBI 
Checkout 8
Rp 237,140 x
C142 V-Belt MBI 
Checkout 9
Rp 61,200 x
A102 V-Belt MBI 
Checkout 10
Rp 146,700 x
B163 V-Belt MBI 
Checkout 11
Rp 122,400 x
B136 V-Belt MBI 
Checkout 12
Rp 134,993,308 x
Genset 12.5 KVA Kubota KJT 130 DX | Build Up | 

Subtotal

Rp 143,952,257

Pengirman

Total

Rp 143,952,257

Pembayaran

  • Transfer Bank Rekening Niagakita