Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 292,250 x
C175 V-Belt MBI 
Checkout 2
Rp 1,692,282 x
ROLLER ASSY TRACK B AW70V/AW82 
Checkout 3
Rp 10,000 x
NOK Oil Seal TC 35 - 52 - 8 
Checkout 4
Rp 1,690,000 x
PISTON D1105 
V belt LB 87 Combine Harvester
Rp 220,000 x
AG6A LB 67 DC 35 MBI 
Checkout 5
Rp 27,500 x
Sleeve 35x45x17 aw70 - aw82 
Checkout 6
Rp 74,400 x
A124 V-Belt MBI 
Ring Piston RD 85
Rp 185,000 x
Ring Piston RD 75-85 DI -1/2 
Tempat produk
Rp 193,000 x
Air Cleaner Assy RD 50 - 65 T / DI - S 
Cover 2 Fuel Tank, Comp RD 85 DI -2 T
Rp 116,000 x
Cover 2 Fuel Tank, Comp RD 140 DI-2T 
V belt RECMF
Rp 42,323 x
L1 RECMF 6405 VB MBI 
V belt LB 64 Combine Harvester
Rp 439,500 x
AG8A LB 64 VB MBI AW 70/82 
Checkout 7
Rp 16,750 x
K18 V-Belt MBI 
Checkout 8
Rp 39,000 x
PIN KNOCK RD 75-85 DI -1/2 

Subtotal

Rp 5,038,005

Pengirman

Total

Rp 5,038,005

Pembayaran

  • Transfer Bank Rekening Niagakita