Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
V belt LB 87 Combine Harvester
Rp 220,000 x
AG6A LB 67 DC 35 MBI 
Checkout 1
Rp 32,550 x
B25 V-Belt MBI 
Checkout 2
Rp 70,840 x
RECMF8440 V-Belt MBI 
Checkout 3
Rp 23,360 x
REMF1320 V-Belt MBI 
Checkout 4
Rp 62,790 x
RECMF8390 V-Belt MBI 
Checkout 5
Rp 23,800 x
K34 V-Belt MBI 
Checkout 6
Rp 584,500 x
C175 V-Belt MBI 
Tempat produk
Rp 1,168,000 x
V BELT - AG 8A LC 111 
Crank Shaft Assy
Rp 4,650,000 x
Crank Shaft, Assy KND 250 
Checkout 7
Rp 350,000 x
FUEL FILTER, ASSY RD 160/ KND180-190-220-250-315 
Checkout 8
Rp 18,980 x
REMF1260 V-Belt MBI 
Checkout 9
Rp 38,392,000 x
RD 110 DI-N RPM 2.400 
Checkout 10
Rp 1,225,000 x
PISTON V2403 - 7 
V belt LC 56 Combine Harvester
Rp 944,600 x
AG8A LC 56 DC 35 MBI 

Subtotal

Rp 47,766,420

Pengirman

Total

Rp 47,766,420

Pembayaran

  • Transfer Bank Rekening Niagakita