Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
V belt LB 64 Combine Harvester
Rp 879,000 x
AG8A LB 64 VB MBI AW 70/82 
Checkout 1
Rp 85,200 x
A142 V-Belt MBI 
Checkout 2
Rp 102,500 x
Element Assy (D72XL90) aw70 - aw82 
Checkout 3
Rp 59,570 x
RECMF8370 V-Belt MBI 
Checkout 4
Rp 16,750 x
M18 V-Belt MBI 
Checkout 5
Rp 385,000 x
FUEL TANK, ASSY RD 45-55-65 
V belt RECMF
Rp 42,323 x
L1 RECMF 6405 VB MBI 
Tempat produk
Rp 920,000 x
V BELT - AG 6A LB 87 
Checkout 6
Rp 5,000 x
Shim, Pump Adjusting RD 75-85 / 105-115 DI - 1/2 
V belt LC 56 Combine Harvester
Rp 472,300 x
AG8A LC 56 DC 35 MBI 
V belt LB 107 Combine Harvester
Rp 556,721 x
AG8A LB 107 VB MBI 
Tempat produk
Rp 575,960 x
V BELT AG-X LC 56 DC 35 
Checkout 7
Rp 27,500 x
Sleeve 35x45x17 aw70 - aw82 

Subtotal

Rp 4,127,824

Pengirman

Total

Rp 4,127,824

Pembayaran

  • Transfer Bank Rekening Niagakita