Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 90,000 x
SUPPORT, FUEL TANK 2 RD 75-85 DI -1/2 
Checkout 2
Rp 225,000 x
CYLINDER LINER RD 65 DI 1/2 S 
Checkout 3
Rp 16,750 x
M28 V-Belt MBI 
Checkout 4
Rp 82,200 x
A137 V-Belt MBI 
Tempat produk
Rp 575,960 x
V BELT AG-X LC 56 DC 35 
Checkout 5
Rp 42,300 x
CAPIT SARANGAN N120 DRAT 
ring piston rd 75
Rp 250,000 x
RING PISTON RD 75 
Tempat produk
Rp 460,000 x
V BELT - AG 6A LB 87 
Checkout 6
Rp 16,750 x
M23 V-Belt MBI 
Checkout 7
Rp 385,568 x
GEAR DC 70 
Checkout 8
Rp 350,000 x
FUEL FILTER, ASSY RD 160/ KND180-190-220-250-315 
Checkout 9
Rp 10,000 x
STUD, HOLDER NOZZLE KND/ER 700-800-75-80-85-105 
Checkout 10
Rp 958,000 x
Assy Gear DC 70 
Checkout 11
Rp 40,000 x
SARANGAN SEGI 4 BUMBUNGSUNGSANG 
Checkout 12
Rp 61,200 x
B68 V-Belt MBI KUNING 

Subtotal

Rp 3,563,728

Pengirman

Total

Rp 3,563,728

Pembayaran

  • Transfer Bank Rekening Niagakita