Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 10,000 x
NOK Oil Seal TC 35 - 52 - 8 
Cover 1 Fuel Tank, Comp RD 65 DI -1S
Rp 75,000 x
Cover 1 Fuel Tank, Comp RD 85 DI - 1 S 
Checkout 2
Rp 33,500 x
M18 V-Belt MBI 
Tempat produk
Rp 150,000 x
METAL CRANK PIN STD RD 160 / KND 180-190-220-250 
Checkout 3
Rp 825,000 x
Bearing Main - 2 KND/ ER 180-190 
Checkout 4
Rp 316,000 x
N2 LB 92 V-Belt MBI 
Checkout 5
Rp 20,000 x
PIN KNOCK KND/ER 190-220-250 
V belt Maxi Combine Harvester
Rp 1,133,859 x
V Belt Maxxi NDR 85 9-J5-1605 | 5R-3V630 
Checkout 6
Rp 57,760 x
RECMF8380 V-Belt MBI 
Checkout 7
Rp 22,800 x
A38 V-Belt MBI 
V BELT - AG 8A LC 55 MBI
Rp 439,762 x
V BELT - AG 8A LC 55 MBI 
V belt LB 68 Combine Harvester
Rp 429,300 x
AG8A LB 68 VB MBI 
Tempat produk
Rp 767,585 x
VBELT - AG 8A LC 96 MBI 

Subtotal

Rp 4,280,566

Pengirman

Total

Rp 4,280,566

Pembayaran

  • Transfer Bank Rekening Niagakita