Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 49,200 x
A82 V-Belt MBI 
Checkout 2
Rp 986,000 x
SHAFT CHANGE AW70V/AW82 
Checkout 3
Rp 2,100,000 x
INJECTION PUMP, ASSY RD 85 DI 1/2 
Checkout 4
Rp 24,200 x
MF1400 V-Belt MBI 
Checkout 5
Rp 1,479,000 x
PLAT BEVEL CASE DC 35 
Checkout 6
Rp 221,372 x
N2 LB 66 V-Belt MBI 
Checkout 7
Rp 70,840 x
RECMF8440 V-Belt MBI 

Subtotal

Rp 4,930,612

Pengirman

Total

Rp 4,930,612

Pembayaran

  • Transfer Bank Rekening Niagakita