Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 4,334,000 x
KUBOTA GASOLINE ENGINE KG65 
Checkout 2
Rp 429,327 x
AG-X LB 64 V-Belt MBI 
Checkout 3
Rp 68,400 x
A114 V-Belt MBI 
Checkout 4
Rp 99,000 x
A165 V-Belt MBI 
Checkout 5
Rp 2,100,000 x
CAM SHAFT RD 160 / KND 180-190-220-250 
Checkout 6
Rp 90,000 x
GASKET KIT MINOR OVERHOULE RD 85 DI 1/2 S 
Checkout 7
Rp 191,900 x
B202 V-Belt MBI 
Checkout 8
Rp 16,750 x
K16 V-Belt MBI 
Checkout 9
Rp 147,600 x
B164 V-Belt MBI 
ring piston rd 75
Rp 250,000 x
RING PISTON RD 75 
Checkout 10
Rp 182,030 x
C109 V-Belt MBI 
Checkout 11
Rp 150,300 x
B167 V-Belt MBI 
Checkout 12
Rp 23,595 x
MF1390 V-Belt MBI 
Checkout 13
Rp 121,500 x
B135 V-Belt MBI 
SUPPORT, FUEL TANK 1 RD 85 DI 1/2 - S
Rp 180,000 x
SUPPORT, FUEL TANK 1 RD 85 DI 1/2 - S 
Checkout 14
Rp 406,000 x
Roller Carrier 138 AW70V/WA82 
Push Rod Nozzle KND 300-315
Rp 36,000 x
Push Rod Nozzle RD 45-65 / KND 65-80-180 
Checkout 15
Rp 89,400 x
A149 V-Belt MBI 
Checkout 16
Rp 50,000 x
LEVER SPEED CONTROL, ASSY RD 65-85-115 DI 
Checkout 17
Rp 170,100 x
B189 V-Belt MBI 

Subtotal

Rp 9,135,902

Pengirman

Total

Rp 9,135,902

Pembayaran

  • Transfer Bank Rekening Niagakita