Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 52,200 x
B58 V-Belt MBI KUNING 
Checkout 2
Rp 80,100 x
B89 V-Belt MBI 
Checkout 3
Rp 24,200 x
MF1400 V-Belt MBI 
Checkout 4
Rp 55,200 x
A92 V-Belt MBI 
Checkout 5
Rp 21,780 x
MF1360 V-Belt MBI 
Checkout 6
Rp 98,400 x
A164 V-Belt MBI 
Checkout 7
Rp 171,000 x
B190 V-Belt MBI 
Checkout 8
Rp 72,900 x
B81 V-Belt MBI 
Checkout 9
Rp 60,000 x
PLATE 90A 2.2 AW70/AW82 
Checkout 10
Rp 64,800 x
A108 V-Belt MBI 
Checkout 11
Rp 107,000,000 x
GENSET 20 KVA KUBOTA SQ 3200 (Build Up) 
Checkout 12
Rp 2,100,000 x
CAM SHAFT RD 160 / KND 180-190-220-250 

Subtotal

Rp 109,800,580

Pengirman

Total

Rp 109,800,580

Pembayaran

  • Transfer Bank Rekening Niagakita