Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 4,334,000 x
KUBOTA GASOLINE ENGINE KG65 
Checkout 2
Rp 16,750 x
M19 V-Belt MBI 
Checkout 3
Rp 16,750 x
K24 V-Belt MBI 
Checkout 4
Rp 130,000 x
Shaft Idle Gear KND 90A / RD 105-115 DI 
Checkout 5
Rp 1,920,000 x
GEAR REDUCTION 15X39 AW70/AW82 
Checkout 6
Rp 32,400 x
A54 V-Belt MBI 
Checkout 7
Rp 724,490 x
AG-X LB 108 V-Belt MBI 

Subtotal

Rp 7,174,390

Pengirman

Total

Rp 7,174,390

Pembayaran

  • Transfer Bank Rekening Niagakita