Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 400,000 x
FUEL TANK, ASSY RD 85 DI -1 T 
Checkout 2
Rp 281,746 x
AG-X LB 42 V-Belt MBI 
Checkout 3
Rp 237,094 x
METAL, SIDE V2403 - 7 
Push Rod Nozzle KND 300-315
Rp 257,000 x
Push Rod Nozzle KND 300-315 
Checkout 4
Rp 51,791,300 x
Kubota Diesel D905-E2B-EU-X1 
Checkout 5
Rp 21,170 x
REMF1290 V-Belt MBI 
Checkout 6
Rp 960,196 x
AG COG20 RCLB-59 V-Belt MBI 
Checkout 7
Rp 61,500 x
PLONG STRENG 1.4 
V belt Maxi Combine Harvester
Rp 1,133,859 x
V Belt Maxxi NDR 85 9-J5-1605 | 5R-3V630 
Checkout 8
Rp 59,570 x
RECMF8370 V-Belt MBI 
Checkout 3
Rp 237,094 x
METAL, SIDE V2403 - 6 
Checkout 10
Rp 288,910 x
C173 V-Belt MBI 
Checkout 11
Rp 64,400 x
RECMF8400 V-Belt MBI 

Subtotal

Rp 55,793,839

Pengirman

Total

Rp 55,793,839

Pembayaran

  • Transfer Bank Rekening Niagakita