Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 67,620 x
RECMF8420 V-Belt MBI 
Checkout 2
Rp 20,540,000 x
TURBO D1105 
V BELT - AG 8A LC 55 MBI
Rp 439,762 x
V BELT - AG 8A LC 55 MBI 
V belt LB 68 Combine Harvester
Rp 429,300 x
AG8A LB 68 VB MBI 
Checkout 3
Rp 33,300 x
B37 V-Belt MBI 
Tempat produk
Rp 449,452 x
V BELT AG-X LB 67 DC 35 
Checkout 4
Rp 85,500 x
B95 V-Belt MBI 
Checkout 5
Rp 770,000 x
FUEL TANK, ASSY RD 45-55-65 
Checkout 6
Rp 88,700 x
PLONG STRENG 3.8 
ring piston rd 75
Rp 250,000 x
RING PISTON RD 75 
Checkout 7
Rp 76,500 x
B85 V-Belt MBI 
Checkout 2
Rp 227,500 x
METAL,CRANKPIN V2403 - 6 

Subtotal

Rp 23,457,634

Pengirman

Total

Rp 23,457,634

Pembayaran

  • Transfer Bank Rekening Niagakita