Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 288,910 x
C173 V-Belt MBI 
cylinder head assy rd 75
Rp 525,000 x
CYLINDER HEAD ASSY RD 75-85 DI-1/2 
V BELT - AG 8A LC 55 MBI
Rp 439,762 x
V BELT - AG 8A LC 55 MBI 
APPARATUS FUEL LIMITER RD 75 DI-1N
Rp 179,000 x
APPARATUS FUEL LIMITER RD 75 DI-1N 
PIN, STARTING ALL TYPE
Rp 30,000 x
PIN, STARTINGALL TYPE 
Checkout 2
Rp 59,570 x
RECMF8370 V-Belt MBI 
Checkout 3
Rp 1,300,000 x
CAM FUEL KND 180-190-220-1500 
V belt LB 64 Combine Harvester
Rp 439,500 x
AG8A LB 64 VB MBI AW 70/82 
Checkout 4
Rp 67,620 x
RECMF8420 V-Belt MBI 
Checkout 5
Rp 9,700 x
NOK Oil Seal SC 25 - 35 - 6 
Clamp Nozzle
Rp 100,000 x
CLAMP NOZZLE RD 75-85 / 105-115 DI -1/2 
Checkout 6
Rp 85,500 x
B95 V-Belt MBI 
Checkout 7
Rp 107,000,000 x
GENSET 20 KVA KUBOTA SQ 3200 (Build Up) 
Checkout 8
Rp 227,500 x
METAL,CRANKPIN V2403 - 6 
Checkout 9
Rp 36,500 x
Seal, Valve Stem DC 35 
Tempat produk
Rp 25,000 x
Nut, Cylinder Head KND 90A -110 / RD115 DI 
Checkout 8
Rp 88,946 x
METAL, SIDE D1105 
Checkout 11
Rp 1,159,741 x
AG COG20 RCLC-52 V-Belt MBI 
Checkout 12
Rp 18,755 x
MF1310 V-Belt MBI 
Checkout 13
Rp 70,000 x
GASKET CYLINDER HEAD. NA RD 85 DI 1/2 - S 
Checkout 14
Rp 65,100 x
B32 V-Belt MBI 

Subtotal

Rp 112,216,104

Pengirman

Total

Rp 112,216,104

Pembayaran

  • Transfer Bank Rekening Niagakita