Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 1,064,465 x
GEAR KUBOTA DC 70 
Checkout 2
Rp 16,750 x
M18 V-Belt MBI 
Checkout 3
Rp 59,570 x
RECMF8370 V-Belt MBI 
Cover 1 Fuel Tank, Comp RD 65 DI -1S
Rp 75,000 x
Cover 1 Fuel Tank, Comp RD 85 DI - 1 S 
Checkout 4
Rp 57,760 x
RECMF8380 V-Belt MBI 
V belt LB 107 Combine Harvester
Rp 1,113,442 x
AG8A LB 107 VB MBI 
Tempat produk
Rp 15,000 x
O Ring, Main Bearing Case RD 105-110 DI-2 
Tempat produk
Rp 208,000 x
Gear Crank Shaft RD 95-105-115 DI 
Tempat produk
Rp 45,000 x
Drain Pipe, Assy All Type 
Checkout 5
Rp 567,000 x
Bearing Main - 2 KND/ ER 70-75-80-85 DI 
Checkout 6
Rp 1,415,600 x
RHR NIRI Top 10x10 
Checkout 5
Rp 1,227,000 x
Bearing Main - 2 KND/ ER - 220 - 250 - DI 
V belt RECMF
Rp 42,323 x
L1 RECMF 6405 VB MBI 
Ring Piston RD 85
Rp 295,000 x
Ring Piston RD 55 
Checkout 8
Rp 16,750 x
M24 V-Belt MBI 
Checkout 9
Rp 38,063 x
NUT M24 
Tempat produk
Rp 95,000 x
Pipe Injection RD 105-110 DI-2 
Checkout 10
Rp 14,264,000 x
RD 65 DI-2S 6.5 RPM 2.200 
Tempat produk
Rp 606,045 x
VBELT - AG 8A LB 104 MBI 
Checkout 11
Rp 598,125 x
SPROKET (AXLE) DC 35 
Checkout 12
Rp 963,000 x
Cylinder Liner KND 300-315 

Subtotal

Rp 22,782,893

Pengirman

Total

Rp 22,782,893

Pembayaran

  • Transfer Bank Rekening Niagakita