Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 1,014,000 x
ASSY RING PISTON V2403 - 7 
Checkout 2
Rp 15,000 x
RETAINER MAIN BEARING KND/ RD 105-115 DI 
Checkout 3
Rp 1,098,045 x
CONVEYOR GRAIN EVEL AW70V/AW80 
Checkout 4
Rp 1,205,000 x
HOLDER NOZZLE, ASSY RD 45-55-65-160/ KND180 -1500 
Checkout 5
Rp 49,800 x
A83 V-Belt MBI 
OLI KUBOTA 2,5 LTR
Rp 117,500 x
OLI KUBOTA 2,5 LTR 
Checkout 6
Rp 32,400 x
A54 V-Belt MBI 
Checkout 7
Rp 5,000 x
O Ring, Pin Pipe RD 65-85-115 

Subtotal

Rp 3,536,745

Pengirman

Total

Rp 3,536,745

Pembayaran

  • Transfer Bank Rekening Niagakita