Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 17,732 x
CAPIT STRENG 5 ALM BAUT 4 
Checkout 2
Rp 32,550 x
B26 V-Belt MBI 
V BELT - AG 8A LC 109
Rp 871,529 x
V BELT - AG 8A LC 109 
Checkout 3
Rp 35,100 x
B39 V-Belt MBI 
Checkout 4
Rp 15,730 x
MF1260 V-Belt MBI 
Tempat produk
Rp 460,000 x
V BELT - AG 6A LB 87 
Cover 1 Fuel Tank, Comp RD 140 DI-2T
Rp 116,000 x
Cover 1 Fuel Tank, Comp RD 140 DI-2T 
Checkout 5
Rp 12,700 x
NOK Oil Seal TC 30 - 62 - 7 
Checkout 6
Rp 22,800 x
A38 V-Belt MBI 
Checkout 7
Rp 11,310,000 x
ASSY STARTER V2403 - 6 
V belt LC 56 Combine Harvester
Rp 472,300 x
AG8A LC 56 DC 35 MBI 
V belt LB 68 Combine Harvester
Rp 429,300 x
AG8A LB 68 VB MBI 

Subtotal

Rp 13,795,741

Pengirman

Total

Rp 13,795,741

Pembayaran

  • Transfer Bank Rekening Niagakita