Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 77,400 x
A129 V-Belt MBI 
Checkout 2
Rp 1,592,500 x
PISTON V2403 - 6 
Checkout 3
Rp 22,800 x
A38 V-Belt MBI 
Checkout 4
Rp 72,450 x
RECMF8450 V-Belt MBI 
Checkout 2
Rp 11,310,000 x
ASSY STARTER V2403 - 6 
Checkout 6
Rp 45,000 x
SEAT SPRING UPPER RD 75-85 / 105-115 DI -1/2 
Checkout 7
Rp 32,550 x
B32 V-Belt MBI 
Tempat produk
Rp 1,168,000 x
V BELT - AG 8A LC 111 
Checkout 8
Rp 35,040 x
REMF1480 V-Belt MBI 
Checkout 9
Rp 38,710 x
REMF6395 V-Belt MBI 
Checkout 10
Rp 82,110 x
RECMF8510 V-Belt MBI 
Checkout 11
Rp 2,100,000 x
INJECTION PUMP, ASSY RD 85 DI 1/2 
Tempat produk
Rp 767,585 x
VBELT - AG 8A LC 96 MBI 
Tempat produk
Rp 1,636,917 x
SANWA YC-80A-4 HP 0.33 - 1500 
Checkout 12
Rp 16,543,000 x
RD 65 DI-NB 6.5 RPM 2.200 
V belt LB 107 Combine Harvester
Rp 556,721 x
AG8A LB 107 VB MBI 
V belt LC 56 Combine Harvester
Rp 472,300 x
AG8A LC 56 DC 35 MBI 
Checkout 13
Rp 135,000 x
AA111 V-Belt MBI 
Tempat produk
Rp 606,045 x
VBELT - AG 8A LB 104 MBI 
Checkout 2
Rp 780,000 x
METAL, CRANKSHAFT V2403 
Checkout 15
Rp 61,200 x
B68 V-Belt MBI 
Checkout 16
Rp 385,000 x
Valve Inlet KND 300-315 

Subtotal

Rp 38,520,328

Pengirman

Total

Rp 38,520,328

Pembayaran

  • Transfer Bank Rekening Niagakita