Detail Penagihan

Indonesia

Informasi Tambahan

Tinjau pesanan Anda

Produk Jumlah Total Hapus
Checkout 1
Rp 64,400 x
RECMF8400 V-Belt MBI 
Checkout 2
Rp 875,000 x
Bearing Main - 2 RD 160 
V BELT - AG 8A LC 55 MBI
Rp 439,762 x
V BELT - AG 8A LC 55 MBI 
V belt LC 56 Combine Harvester
Rp 1,416,900 x
AG8A LC 56 DC 35 MBI 
Tempat produk
Rp 2,336,000 x
V BELT - AG 8A LC 111 
Cover 1 Fuel Tank, Comp RD 65 DI -1S
Rp 75,000 x
Cover 1 Fuel Tank, Comp RD 85 DI - 2 S 
Checkout 3
Rp 26,280 x
REMF1360 V-Belt MBI 
Tempat produk
Rp 1,727,880 x
V BELT AG-X LC 56 DC 35 
Checkout 4
Rp 61,000 x
Bush Idle Gear RD 85 DI - 2 
Checkout 4
Rp 195,000 x
Bush Pin Piston KND/ER 180-190-220-250-1500 
Checkout 6
Rp 273,000 x
METAL, CRANK PIN STD D1105 
Crank Shaft Assy
Rp 4,650,000 x
Crank Shaft, Assy KND 250 
Checkout 6
Rp 50,000 x
SUPPORT, FUEL TANK COVER RD 65 T 
Checkout 8
Rp 27,500 x
Sleeve 35x45x17 aw70 - aw82 
Tempat produk
Rp 580,000 x
Cam Fuel RD 75-85 DI 
Checkout 9
Rp 22,800 x
A38 V-Belt MBI 
kip ring piston rd 85
Rp 80,500 x
KIP Ring Piston RD 85 DI,1/2 S 
Checkout 10
Rp 95,000 x
SCREW 3 JALUR N50 SK 
Checkout 11
Rp 57,600 x
A96 V-Belt MBI 
Checkout 12
Rp 85,500 x
B95 V-Belt MBI 
Tempat produk
Rp 2,300,000 x
Cylinder Head, Assy RD 95-105-115 DI 
Checkout 13
Rp 571,400 x
RHR BIMA 10X10 
Checkout 14
Rp 1,479,000 x
PLAT BEVEL CASE DC 35 
Tempat produk
Rp 767,585 x
VBELT - AG 8A LC 96 MBI 
Checkout 15
Rp 94,500 x
B105 V-Belt MBI 

Subtotal

Rp 18,351,607

Pengirman

Total

Rp 18,351,607

Pembayaran

  • Transfer Bank Rekening Niagakita